Male eyebolt DIN580 M12
Broad brimmed washer DIN9021
M12
Hex nut DIN934 M12
Select appropriate slings to the weight of the boiler. (See specifications of the boiler).
Respect minimum elevation angle of the sling and verify proper load sharing between them.
If the lifting is done without having removed the hopper assembly - boiler body, the hopper must be empty.
Attention!: If the boiler is lifted in full, it will pitch. Lift carefully.
For future maintenance or repairs, distances from walls and ceilings must be respected.
x4
x4
x4
Drawing 10
CLEAR DISTANCES.
49
Drawing 9