5. Cable connection steps
1
Four-core
4
For Ripple Control
6
74
1
Four-core
M2
0.4 ± 0.1 N·m
1
2
When not wiring, the sealing plug should be retained.
3
For Meter/CT
2
Four-core
5
For DIO
2
4
3
2
1
Three-core
3
1
Click!
2
M2
0.4 ± 0.1 N·m
M3
0.6 ± 0.1 N·m