2.INSTALLATION
2.3 DRILLING THE WALL (P5)
Please note: If you are drilling the hole above
ground floor level, please ensure that an area
has been secured and while the holes are drilled
the outside area is supervised, until drilling has
been completed.
INTAKE AND OUTLET HOLES
-
This operation should be carried out using
the proper tools (diamond tip or core borers
drills with high twisting torque and adjustable
rotation speed).
-
Fasten the template to the wall taking
care to check the distance from the floor and
or ceiling and keep it horizontal by using a
spirit level.
-
Use a pilot drill to mark the centre of each
core hole to be drilled,
-
Use a core boring head having a diameter
of 162 mm to drill the two holes for intake and
outlet the air.
It is recommended that the holes must
have a slightly downward inclination of
3-5 degrees to prevent any backflow of water
from the pipes.
3° INCLINATION
Indoor
DRAINAGE HOLE (P13)
This air conditioner has a double system to drain
the condensate moisture automatically.
Before install the Air Conditioner choose which
is the suitable system for your installation.
Please read carefully the follow instructions.
System "A": drill a hole through the wall mea-
suring 30mm in diameter in the position shown
in the paper template. Drainage occurs by gravity.
For this reason, it is essential for the drain
line to have a minimum downward inclination
at least 3 degrees through out its length:
connect the drain pipe (from rubber terminal) to
the air conditioner (back side) after unplugged
the black rubber cup (see picture P13). With this
solution you can drain the condensate moisture
to a suitable place to do not cause any problems
to your neighbours.
Soft terminal
System "B": in case of impossibility to install the
drainage pipe as showed on "A" system. Do not
unplugged the black rubber cup(picture P13).
P5
The condensate moisture will go outside by the
two big pipes(see picture P14). If you choose this
Outdoor
solution be sure that the condensate moisture do
not cause any problems to your neighbors.
2.4 FASTENING THE BRACKET(P6)
- Drill the holes for anchoring the fastening bracket
to the wall using preferably the 6 holes showed in
black on the paper template. If the wall is not
sturdy enough it is advisable to use extra anchor
bolts using the holes showed in grey on the paper
template.
10
A
Hard terminal
ENGLISH
P13
A
B
B