English
safety and damage its components. The warranty does not cover any
costs arising from defaults at this point.
For Inertial Accumulator commissioning, proceed as indicated in the se-
quence below.
Slowly fill the system and vent the air present inside it.
Start the system.
Before entrusting the system to the final user or to the manager, the
installer must make sure that all connections and pipes are sealed and
that all control elements work correctly. In addition, he/she must explain
tank and system functions and management, referring to this instruction
manual.
3.2 Operation
The maximum operating temperatures indicated in this document and
on the nameplate of the device shall be considered as the maximum
temperatures that the DHW tank inner lining can bear. It is also reminded
that the maximum operating temperature must comply with the standards
concerning energy consumption reduction. For Italy, see the provisions
by Law 10/91 and subsequent implementation and integration Decrees.
4. Disposal
At the end of the product life-cycle its metallic components should be
handed over to operators authorised to collect metallic materials for recy-
cling purposes, while non-metallic components should be handed over to
operators authorised to dispose of them.
If disposed of by the end customer, the products must be managed as
urban waste and therefore in compliance with the regulations in force
in the place of installation. In any case they should not be managed as
household waste.
- 12 -
Cod. 1910000001059 - nv07
Cod. 1910000001059 - nv07