Télécharger Imprimer la page

aquabrass TURBO Totem ABSVT12123 Guide D'installation page 5

Publicité

Installation
1
Wall Setup
Préparation du mur
Determine the valve location in the wall. For an
optimal installation, position the valve on a plywood
backing attached to the adjacent 2x4 studs.
BEFORE FIXING THE VALVE ONTO THE PLYWOOD
BACKING, MAKE SURE IT IS LEVEL.
TO ENSURE PROPER INSTALLATION OF THE VALVE INSIDE
THE WALL, IT IS VERY IMPORTANT TO FOLLOW
THE RECOMMENDED DEPTH AS INDICATED IN THE
ILLUSTRATION (Fig.2).
Déterminer la position de la valve dans le mur.
Pour une installation optimale, fixer la valve sur un
support arrière en contre-plaqué assemblé aux
montants 2x4.
AVANT DE FIXER LA VALVE AU SUPPORT EN
CONTRE-PLAQUÉ, S'ASSURER QU'IL SOIT À NIVEAU.
AFIN D'OBTENIR UNE INSTALLATION CORRECTE DE LA
VALVE, IL EST IMPORTANT DE RESPECTER LA PROFONDEUR
SUGGÉRÉE TEL QU'ILLUSTRÉ (Fig.2).
Last revision:21/09/2020
TURBO Totem T12123
Wood screw/Vis à bois
(not supplied / non fournies)
5
Plywood support
Support en contre-plaqué
Finished wall
Mur de finition
Min. 3 1/4"
Max. 3 3/4"
aquabrass.com
Fig.1
Fig.2

Publicité

loading

Ce manuel est également adapté pour:

Turbo totem t12123