Installation manual
Probe 2
Probe 1
A FILTERING
2.6.
Probe location.
Probes will be located the following way: "Probe1" 8 cm above the deposit exit (pipe going to
the filtering pump) and "Probe 2" 16 cm.
Note: approximate measures calculated for a compensation deposit from 1000 to 2000 litres.
The electro valve will activate when the level goes under the first probe "Probe 1" and will
deactivate when going above the second probe "Probe 2".
2.7.
Probe connection.
Take both probes from the electric panel. Screw the screw in tight and remove the plastic
wrapping.
Take cable of section 1mm2, connect it to the nucleus and replace the plastic wrapping in the
sensor. Follow the same procedure with the other sensor.
Put silicone between the connection of the probe and the cable, to avoid false
contacts caused by water oxidation.
For further information read the operation cabinet user manual.
OVERFLOW ENTRY
WATER ENTRY
16
8
7
English
DRAINAGE