Télécharger Imprimer la page

Bradley S19-2300 Serie Instructions Pour L'installation Et L'entretien page 5

Publicité

Installation and Maintenance Instructions
Installation Instructions: Valve with Optional Surface-Mounted Cabinet
Note: Flush the supply lines before beginning installation.
1. Measure and mark the cabinet mounting hole locations at the dimensions shown in Figure 4. Install six
3/8" wall anchors (supplied by installer).
2. Position the cabinet onto the wall and secure into place with six 3/8" wall fasteners (supplied by
installer).
3. Install the valve nipples and one-half of the union ball valve using pipe dope or teflon tape. Then install
the other half of the union ball valve onto the inlet and outlet piping.
4. Insert the valve into the bracket in the cabinet (right side of the valve goes in first). Continue with the
valve installation procedure found on page 3.
FRONT VIEW
2"
(51)
1-1/4" NPT INLETS
Figure 4
Bradley Corporation • 215-1594; EN 05-914A
Bradley EFX 125 Thermostatic Mixing Valve with Optional Cabinet
1-1/2" NPT OUTLET
2-1/2"
(64)
3"
5"
(76)
(127)
18"
(457)
.28 Ø HOLES
(4) EACH SIDE
(8) TOTAL
2-3/4"
(70)
2-3/4"
(70)
6-1/2"
(165)
BOTTOM VIEW
24"
(610mm)
8-3/8"
SIDE VIEW
(213)
26-5/8"
(677)
5-5/8"
(143)
MOUNTING HOLE LOCATIONS
5-1/2"
(140)
.47 Ø
(12)
24"
(610)
10-1/8"
(257)
2"
(51)
2"
(51)
Model S19-2300 Series
22-3/4"
(578)
28"
(711)
10-1/2"
(267)
24"
(610)
11-3/8"
(289)
20"
(508)
4-12-2006
5

Publicité

loading

Ce manuel est également adapté pour:

Efx 125