Télécharger Imprimer la page

Parkside Performance PPHSA 40-Li C3 Instructions De Montage, D'utilisation Et Consignes De Sécurité page 42

Publicité

˜ Switching on/off
(Fig. B)
NOTE
You can only operate the product with
u
2 battery packs
[
9 ]
Before switching on the product: Remove
u
the blade encasing
cutter bar
.
[
2 ]
Do not lock the on/off switch
u
safety switch
. The motor must switch
[
]
off when you release the switches.
Switching on
m
CAUTION! Risk of personal injury
and damage to the product!
Ensure your stance is stable and hold the
u
product tightly with both hands and away
from your body.
m
NOTICE! Risk of property
damage and damage to the
product!
Before switching on the product: Make
u
sure that the product is not touching any
objects.
1. Insert the battery packs
2. Remove the blade encasing
3. Always hold the product with both hands:
One hand on the handle
hand on the front handle
4. Press and hold the safety switch
front handle
while pressing the on/off
4 ]
[
switch
on the handle
[
7 ]
5. The product runs at the lowest speed
(Setting the speed: see "Setting the stroke
rate").
Switching off
1. Release either the safety switch
on/off switch
.
7 ]
[
.
from the safety
[
]
and the
[
7 ]
.
9 ]
[
.
[
]
and the other
[
8 ]
.
[
4 ]
on the
[
]
.
[
8 ]
or the
[
]
2. Wait until the product has stopped before
placing it down.
3. Remove the battery packs
product if you are leaving the product
unattended or if you have finished working.
˜ Checking the charging level
of the battery packs on the
product
Press the
button
o
panel
.
5 ]
[
The charging level of the battery packs
o
is indicated by illumination of the
corresponding LEDs on the charging level
indicator
.
[
]
During operation, the charging level of the
o
battery packs
9 ]
[
on the charging level indicator
Colour
Red, orange, green
Red, orange
Red
Charge the battery packs
o
red LED on the charging level indicator
is illuminated.
˜ Transport
Switch off the product and remove the
o
battery packs
. Let all moving parts come
[
9 ]
to a complete stop.
Always transport the product with the blade
o
encasing
.
[
]
Always carry the product by the handle
o
˜ Cleaning, care and storage
m
WARNING! Risk of injury due to
unintentional start-up!
Protect yourself when performing
u
maintenance or cleaning work.
Switch off the product and remove the
u
battery packs
9 ]
[
from the
9 ]
[
on the control
[
]
9 ]
[
is permanently displayed
.
[
]
Meaning
Fully charged
Half charged
Needs to be charged
when only the
9 ]
[
[
.
GB/IE
]
.
8 ]
[
41

Publicité

loading

Produits Connexes pour Parkside Performance PPHSA 40-Li C3

Ce manuel est également adapté pour:

449935 2310