4.3.1 Hand pump
2
> Connect the hand pump JP 26 (1) to the jack (5) or
to two jacks via hose (4).
> Close the lowering screw (3) on the hand pump (1)
(turn clockwise).
NOTE
The lowering screw must be closed or the load will not
be lifted.
> Move the pump lever (2) up and down. The load will
be lifted.
> Place suitable supports (square timbers) under the
load and secure.
To lower the load: Open the lowering screw (3) slowly
in the counter-clockwise direction.
- 54 -
1
3
4
© JUNG Hebe- und Transporttechnik GmbH
Jacks of the JH / JH EX / JHS series
5