Télécharger Imprimer la page

Napoleon GSS36CFE Manuel D'installation Et D'utilisation page 7

Publicité

1.2
rates and effi ciencies
For your satisfaction, this appliance has been test-fi red to assure its operation and quality.
Altitude (FT)
Max. Input (BTU/HR)
Min. Inlet Gas Supply Pressure
Max. Inlet Gas Supply Pressure
Manifold Pressure (Under Flow Conditions)
1.3
installation overview
10
1. Determine the fi nal location of the appliance (see "location" section).
2. Determine the most appropriate gas inlet location (see "gas inlet location" section).
3. Plan out appliance enclosure, framing, fronts, accessories, etc.
4. Install rough framing (see "framing" section).
5. Install all electrical wirings (refer to "electrical information" section).
6. Install gas lines (see "gas installation" section).
7. Test appliance.
8. Install nailing tabs (see "nailing tab installation" section).
9. Complete framing (see "framing" section).
10. Complete fi nishing (see "fi nishing" section).
6
5
9
4
8
7
general information
Natural Gas
4.5" (11mb) w.c.
13" (32mb) w.c.
3.5" (9mb) w.c.
1
3
2
Propane
0-4,500
40,000
11" (27mb) w.c.
10" (25mb) w.c.
W415-2978 / 02.16.21
EN
7

Publicité

loading

Ce manuel est également adapté pour:

Riverside serieGss36cfneGss36cfpe