6. Operation
•
Set up the pump on flat and firm ground.
•
Attach the intake line ready for use.
•
Unscrew the water filler screw (2) and remove the coarse filter (8)
together with the non-return valve (9) as shown in Figure 2. Now
you can fill the pump housing with water. Filling the intake line ac-
celerates the priming process.
•
Assemble in reverse order.
•
Plug into the mains.
•
Press the ON switch (5)
•
All shut-off devices in the pressure line (spray nozzles, valves
etc.) must be fully opened when priming so that any air in the in-
take line can escape.
•
Depending on the suction height and the amount of air in the in-
take line, priming can take anywhere between 30 seconds and
5 minutes. If it takes longer than this, the pump should be refilled
with water.
•
If the pump is removed again after use, it must always be refilled
with water whenever it is connected up and used again.
GB
Operating the fl ow switch:
The operating mode is indicated by the LEDs.
Yellow Power ON is lit:
The power cable is connected.
Yellow Power ON and Green Pump ON are lit:
The pump is in operation and starts up immediately; a consumer for
drawing off medium is open.
Yellow Power ON, Green Pump ON and Red
Failure are lit:
The pump is running dry without any medium. For approx. 30 se-
Anl_PE-HWA_630_SPK7.indb 142
Anl_PE-HWA_630_SPK7.indb 142
- 142 -
28.01.2022 11:05:05
28.01.2022 11:05:05