MB92 Quick Start Guide
2.3. Connecting to a Power Supply
Warning! Risk of Electric Shock
• Use only the 3-pin power cord with equipment grounding
connector which was supplied with your instrument. Only
connect the power cord to a 3-pin ground outlet.
• Only extension cords which meet the relevant standards and
also have an equipment grounding conductor may be used.
Attention:
• Before connecting power, verify that the product or its AC adapter input
voltage range and plug type are compatible with the local AC mains power
supply.
• The dryer unit is designed to operate at a specific line voltage (110V AC
or 240V AC). The dryer unit is installed at the factory and is matched to
the particular line voltage of the country of destination.
• Connection to a line voltage that is too high can lead to burning out the
heater, whereas, a supply voltage that is too low will prolong the drying
process and the instrument may not operate properly.
Connect to Power
Connect the power cord to the power supply
socket located at the rear of the Moisture
Analyzer and to the power supply outlet. The
Moisture Analyzer becomes operational as
soon as power is applied. The display will
remain off until the On/Off button is pressed.
Note:
Place the Moisture Analyzer in the room where it will be used for at least 4
hours to adapt itself to ambient conditions. Turn on the moisture analyzer
for at least 30 mins to warm up.
Attention:
If the power cable supplied is not long enough, use only a proper 3-pin
extension cable with an equipment grounding connector.
EN - 7