Safety instructions / Before assembly / Assembly
When moving the umbrella stand
with an open umbrella in it, only
lift it by the umbrella stand.
Before assembly
Unpacking the
umbrella base
Take the umbrella base out of
the package and remove all
packaging materials.
Check that the scope of delivery
is complete and whether the um-
brella base has been damaged.
Assembly
materials required: 25 kg sand and
a shovel.
Note: Only place the umbrella
stand on a firm and level surface.
Assembling the base
Fit both end caps
base halves
Place the base halves
the open sides upwards in front
of you (see Fig. A).
8
GB/IE/NI
on the
1
(see Fig. A).
2
with
2
Fit the half tubes (
recesses of the base halves
so that their sides sit in the
grooves of the tubes (see Fig. A).
Fill the base halves
edge with sand (see Fig. B).
Close the base halves
the cover plates
all of the circumferential notches
click into place. You may have to
remove some sand if necessary
(see Fig. C and D).
Carefully lay the pre-assembled
parts alongside each other on a
flat, level surface (see Fig. E).
Connect the base halves using the
connection parts
Assembling the parasol
Select the adjusting ring
the lowest tolerance which cor-
responds to the diameter of your
umbrella pole (see Fig. G).
Place the adjusting ring with the
large drill hole pointing upwards
in the tube (
+
3
For umbrella poles less than
32 mm in diameter use the
reducing part
6
Twist the nut
gently onto the
5
tube, insert the umbrella and
tighten the nut
5
Fig. H).
+
) in the
3
9
2
up to the
2
using
2
. Ensure that
8
(see Fig. F).
7
with
4
) (see Fig. G).
9
(see Fig. H).
by hand (see