Nemo D4-L+
1.1
Resets
Possibility to reset the performed counts
1.1a
Partial Active Energy
Reset no (no) or yes (YES)
↵
selects no or YES
confirms
1.1b
Current Max. Demand
Reset no (no) or yes(YES)
↵
selects no or YES
confirms
1.1c
Power Max. Demand
Reset no (no) or yes(YES)
↵
selects no or YES
confirms
1.1d
Run Hour Meter
(working hours and minutes)
Reset no (no) or yes(YES)
↵
selects no or YES
confirms
6
1.2
Connection
↵
selects the connection
Confirms
Select the desired connection and scrupulously respect the linked wiring diagram.
The selectable wiring diagrams are:
Symbol
Line
Load
1N1E
Single-phase
3-1E
3-phase 3 wires
Balanced
3N1E
3-phase 4 wires
Balanced
3-2E
3-phase 3 wires
Unbalanced
3-2E
3-phase 3 wires
Unbalanced
3-2E
3-phase 3 wires
Unbalanced
3-3E
3-phase 4 wires
Unbalanced
3N3E
3-phase 4 wires
Unbalanced
1.3
Power Demand
Combined power:
activa (W), reactiva (VAr), apparent
↵
selects power
confirms
1.4
Current delay time and average power
Selectable delay time:
5, 8, 10, 15, 20, 30, 60 minutes
The selected time is valid both for the current and the average power
↵
selects the time value
confirms
n°CT external
Wiring
-
1
S 1000/305
1
S 1000/357
1
S 1000/358
2
S 1000/306
2
S 1000/307
2
S 1000/308
3
S 1000/309
3
S 1000/310
(VA)
03/16 10783521 WEB E cod.MF6HT...
Connection
Aron L1 - L2
Aron L1 - L3
Aron L2 - L3