installation
Remove the structure from the pack-
aging and remove the 2 screws A to
separatethe upper part from the lower
part (Fig.1).
- Position hole template on the ceiling
paying attention that the arrow is posi-
tioned on the same side as the appliance
controls (Fig.2).
Make 4, Ø8 holes in the ceiling and drive
in 3 screws without completely tighten-
ing them. Pay attention not to insert the
screw into the hole marked with an X
on the hole template (the screws and
1
expansion plugs must be suitable for the
type of wall).
- Take the upper part of the structure B
(Fig.3) and insert the 3 slots onto the 3
X
screws that are not completely tightened.
Rotate slightly to fit (Fig.3).
Drive in the fourth screw X and tighten
the remaining 3 to allow definitive block-
ing of the upper part ofstructure B.
- Take the lower part of the telescopic
structure C and insert it into the upper
structure B (Fig.4).
Adjust the height and block it using the 8
screws G that are supplied (Fig.5).
B
2
- Fix the flexible pipe to the prepared air
evacuation hole (Fig.6).
- Take the upper chimney piece and fix it to the structure using the 2 screws A (Fig.7).
Join the lower chimney piece with the upper one and fix it carefully using adhesive
tape L (Fig.8).
- Screw the 2 screws O, max 3 mm (Fig.8).
Insert the exhaust unit inside the structure paying attention that the screws O, hook
into the slots in the lower part as indicated in (Fig.9). Drive in the 6 screws N (sup-
plied) and tighten the 2 screws O (Fig.9).
- Fix the air evacuation pipe H (not supplied) onto the connection flange F (Fig.10).
- Remove adhesive tape L and rest the lower chimney piece above the cooker hood
(Fig.11).
- 13 -