Télécharger Imprimer la page

GE JGP630 Instructions D'installation page 7

Publicité

Les langues disponibles

Les langues disponibles

CHECK FOR LEAKS
5
Before testing for leaks, make sure all burner
knobs are in the OFF position.
After connecting the cooktop to gas, check
system for leaks with a manometer. If a
manometer is not available, turn the gas
supply on to the cooktop and use a liquid
leak detector at all joints and connections
to check for leaks.
Tighten all connections if necessary to
prevent gas leakage in the cooktop or
supply line.
DO NOT USE OPEN FLAME TO CHECK
FOR LEAKS!
Disconnect the cooktop and its individual
shut-off valve from the gas supply piping
system during any pressure testing of that
system at test pressures greater than 1/2 psig
(3.5 kPa).
Isolate the cooktop from the gas supply
piping system by closing its individual
shut-off valve during any pressure testing
of the gas supply system at test pressures
equal to or less than 1/2 psig (3.5 kPa).
Installation Instructions
7
INSTALLATION OVER
6
BUILT-IN OVEN
See built-in oven installation for complete
installation instructions.
90° Elbow
Cabinet Sides
5" To Center of
2" Dia. Hole From
Countertop
2" Dia. Hole
(20 7/8" from front
of Countertop to
Hole Center)

Publicité

loading