Télécharger Imprimer la page

TCL RC456CXE0 Mode D'emploi page 8

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
Handling and placement
This refrigerating appliance is not intended to be used as a built-in appliance
The outline dimension of the product and the space needed by the use of
product are shown in the following.
pictures:
Outline dimension of
product
L1
W1
Outline dimension of
L1
580
Notes:
1.When installing the refrigerator as a built-in unit, it is important to consider the accuracy of cabin
measurements and the levelness of the floor.
2.Due to variations in plug sizes and socket locations, the dimensions W2 and L2 for the refrigerator
placement space do not include the plug installation size. When installing the socket, consider the thickness of
the plug and reserve enough space according to the actual situation.
Preparations prior to use
1. Remove all packing assemblies such as case fixing tape etc., especially the foam base.
2. Use warm wet cloth to clean both interior and exterior of the refrigerator, (neutral detergent can
be added in warm water).
3. After leveling and cleaning the refrigerator, stand it for about 2 hours before plugging the power
plug for powering on, and cool the refrigerator for 2 to 3 hours before storing foods.
1. Remove fixing tape
Wipe with
warm and
wet cloth
In hot summer, 24 hours are
needed to fully freeze the food.
Check the refrigerating condition
on the second day.
Space needed by the use of
product
L2
Space needed by the free ventilation
Space needed by the
product
W1
833
>L1+20
2. Connect to power
Total space needed by the use of
W2
use of product
L2
W2
>W1+20
3. Store food after
connecting to power
for 2-3 hours
The plastics deodorant will disappear
automatically after freezing for a while.
7
product
Unit:mm
Total space needed
by the use of product
L3
W3
>L1+450
>W1+480
Do not open the
doors frequently
to save electricity.

Publicité

loading