  • Page 1 Load Management Controller Quick Guide...
  • Page 2 Soovitame enne toote paigaldamist ja kasutamist lugeda läbi terve juhend. Paigaldamise peab läbi viima autoriseeritud paigaldaja. Palun jälgige kõiki kohalikke regulatsioone. Skannige kaasas olev QR-kood, et pääseda juurde kogu kasutusjuhendile teie eelistatud keeles. We recommend to read the entire manual before installing and operating the product. The installation must be carried out by an authorised installer.
  • Page 3 To ensure proper installation, an authorized installer must carry out all installations. Incorrect installation can damage the electrical cabinet. • The VOOL LMC should not be used by Individuals with a lack of experience or knowledge without the supervision of a responsible party. •...
  • Page 4 Kad užtikrintumėte optimalias funkcijas ir veikimą, patikrinkite ir įdiekite naujausią programinės aparatinės įrangos versiją. • Ole hyvä ja lue nämä ohjeet ennen kuin asennat tai huollat VOOL Load Management Controlleria (LMC). • Vältä turvallisuussyistä VOOL LMC:n asentamista ja sen käyttöä lähellä palavia, räjähtäviä, voimakkaita tai palavia materiaaleja, kemikaaleja tai höyryjä.
  • Page 5 For å sikre riktig installasjon må en autorisert installatør utføre alle slags installasjoner. Feil installasjon kan skade det elektriske kabinettet. • VOOL LMC skal ikke brukes av personer med mangel på erfaring eller kunnskap uten tilsyn fra en ansvarlig part. •...
  • Page 6 Leggere le presenti istruzioni prima di installare o eseguire interventi di manutenzione sul controller di VOOL Load Management Controller (LMC). • Per motivi di sicurezza, evitare di installare o utilizzare il controller di gestione del carico VOOL LMC in prossimità di materiali, sostanze chimiche o vapori infiammabili, esplosivi, aggressivi e combustibili.
  • Page 7 1. Connections Ethernet connection CAN to charger 2. Lights Power ON Ethernet connection Charger connection...
  • Page 8 3. Mount the LMC on a DIN rail Before installation, disconnect the power supply to prevent electrical hazards. Secure the LMC on the chosen location on the DIN rail. 4. Connect Current Transformers The LMC comes with three current transformers available in 50A, 100A, and 200A configurations.
  • Page 9 5. Install with Previously Installed Current Transformers or Multimeter If current transformers are installed in the distribution box, ensure compatibility before connecting to the LMC. If a multimeter that supports the Modbus protocol is available on-site, it can be directly connected to the LMC. Both devices need to be connected in the same LAN.
  • Page 10 6. Connect AC Power Supply (Three-Phase) Connect Cables to the Designated Socket and Socket to LMC Switch on the LMC and ensure that top and bottom LED light up If any LEDs are unlit or red, refer to the troubleshooting section. (Single-Phase) Connect Cables to the Designated Socket and Socket to LMC Switch on the LMC and ensure...
  • Page 11 7. Connecting the LMC to Chargers Chargers can be connected to the LMC if they are in the same LAN (local area network) or connected via a CAN connection 7.1.1 VOOL App Basic Router setup Scenario 1: The Charger(s) and the LMC are in the same LAN connected via Ethernet cables.
  • Page 12 7.2.1 VOOL App Basic setup End resistor Scenario 3: The Charger(s) and the LMC are connected via CAN. The LMC is connected to the Internet via an Ethernet cable. The last Charger on the line should be equipped with an end resistor to provide reliable communication between the devices.
  • Page 13 Wifi. In the event that the LAN loses connection to the Internet but remains active locally, the devices may not be visible from the VOOL Portal, but the load management function will continue to work as expected.
  • Page 14 If device is connected online it will appear in the list of devices. Make sure to connect the device(s) online and add them to the same site in the VOOL Portal. Then, select which chargers are connected to LMC on the site setup.
  • Page 15 Once you have set up the LMC, you are ready to add chargers or link the LMC with existing chargers on the site. Hereby MultiCharge OÜ declares that VOOL LMC complies with 2014/53/ EL, RoHS and CE requirements...
  • Page 16 For more information, support, or inquiries, please reach out to us at info@vool.com +372 56567172 Telliskivi 51b, Tallinn ESTONIA...