Télécharger Imprimer la page

LG ESS HB 10.0 Manuel D'installation page 53

Publicité

Les langues disponibles

Les langues disponibles

3.1.4 Clearance
300mm
(12")
Floor
3.1.5 Tools & safety gears required
y Tools
The following tools are required to install the battery pack :
Precision screwdriver
Drill
(Min. Diameter 10 mm, 0.4")
Minimum clearances for the left, right, top
and bottom of the product is shown in
300mm
(12")
the figure for the proper ventilation and
installer convenience.
300mm
(12")
300mm
(12")
M6 Torque wrench
Pencil or Marker
Installation
17
Inclinometer
3

Publicité

loading

Ce manuel est également adapté pour:

Blgresu10h