Télécharger Imprimer la page

Xo C VISOR XOC24SC Mode D'emploi page 14

Publicité

Les langues disponibles

Les langues disponibles

installation "1"
1
B
2
Min 0-1/2"
Max 1/016"
FIXING THE HOOD TO THE LOWER PART OF THE WALL CABINET:
1- Position template B on the wall unit, bearing in mind the measurements and the mi-
nimum distance from the hob.
- Mark the references to fix brackets A to the wall unit, as indicated in figure 1 .
2- Make sure the thickness of the wall unit is within the parameters indicated in figure
1 - step 2.
3- Build the hood in the wall unit and make sure the 2 side springs F are connected cor-
rectly. Fasten the hood to the wall unit using the screwdriver and the relative screws M
and tighten until the device is firmly against the wall unit ( 1 - step 2).
4- Remove pin Y from bracket A. Then place the insert X on the slot of the bracket A, as
indicated in figure 1 - step 3.
- Match the C screws with the L wascher and fix the A bracket to the cabinet as indicated
in figure 1 - step 3.1. Pay attention not to completely tighten screws C before the bra-
24" - 36" - 30"
F
A
3
2
F
- 14 -
4
2
1
M

Publicité

loading

Ce manuel est également adapté pour:

C visor xoc30scC visor xoc36sc