Télécharger Imprimer la page

Hilti TE 30 Mode D'emploi Original page 22

Masquer les pouces Voir aussi pour TE 30:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 35
Total vibration
Vibration emission value for drilling in metal
Uncertainty
Hammer drilling in concrete (a
Uncertainty (K)
Chiseling in concrete (a
Uncertainty (K)
5
Operation
5.1
Preparations at the workplace
CAUTION
Risk of injury! Inadvertent starting of the product.
▶ Unplug the supply cord before making adjustments to the power tool or before changing accessories.
Observe the safety instructions and warnings in this documentation and on the product.
5.1.1
Fitting the side handle
1. Release the side handle clamping band by turning the handle grip.
2. Slide the side handle clamping band over the tool holder from the front and into the recess provided.
3. Bring the side handle into the desired position.
4. Tighten the side handle clamping band by turning the handle grip.
5.1.2
Adjusting the depth gauge (optional)
1. Press the release button on the side handle.
2. Adjust the depth gauge to the desired drilling depth.
3. Release the release button.
4. Check that the side handle is securely attached.
5.1.3
Removing the chuck
CAUTION
Risk of injury. The depth gauge, if fitted but not used, might hinder the operator.
▶ Remove the depth gauge from the product.
Set the function selector switch to the
1. Disconnect the supply cord plug from the power outlet.
2. Grip the chuck as shown in the illustration and pull the three chuck release rings upwards.
3. Lift the chuck upwards away from the tool.
5.1.4
Fitting the chuck
CAUTION
Risk of injury. The depth gauge, if fitted but not used, might hinder the operator.
▶ Remove the depth gauge from the product.
When changing the chuck, set the function selector switch to this position:
1. Disconnect the supply cord plug from the power outlet.
2. Grip the chuck as shown in the illustration and pull the three chuck release rings upwards.
3. Fit the chuck onto the chuck mount.
16
English
)
h, HD
)
h, Cheq
2
3
4
"Chiseling" position for changing the chuck.
4
TE 30
2.6 m/s²
1.5 m/s²
14.4 m/s²
1.5 m/s²
•/•
•/•
2143373
*2143373*
TE 30­AVR
4.4 m/s²
1.5 m/s²
9.7 m/s²
1.5 m/s²
8.8 m/s²
1.5 m/s²
.

Publicité

loading

Ce manuel est également adapté pour:

Te 30-avr