Step 6: Inspect the heating system
a) Visually check the heating system for damage.
EN
b) Verify that any loose heating cable is secured with spacers.
CF
c) Verify that the correct cable spacing of 3" (7.6 cm) has been
maintained and that the heating cable is being kept away from
sharp edges and not crossing expansion joints or across separate
slabs. If applicable, verify that the heating cable is protected when
crossing a crack control join.
d) Verify that the heating system is installed at the correct depth
throughout the heated area.
e) Inspect the connection leads for correct installation.
Step 7: Complete a detailed sketch of the layout
Record the layout of each circuit, with particular reference to the
position of the connection leads. Document the installation with
photos.
Step 8: Perform conductor resistance and insulation
resistance tests as described in section 3.3
Perform the resistance tests on each circuit to detect any damage
that may have occurred during installation.
Record the values for each circuit on the Installation and Inspection
Record in Section 7.
Step 9: Install the surface materials
Install concrete, asphalt, or pavers in accordance with applicable
building and electrical codes.
Step 10: Perform conductor resistance and insulation
resistance tests as described in section 3.3
Perform the resistance tests on each circuit to detect any damage
that may have occurred after installation.
Record the values for each circuit on the Installation and Inspection
Record in Section 7.
Step 11: Connect and install the moisture sensor if
applicable
Install the moisture sensor
in accordance with the
manufacturer's instructions.
Ensure the sensor is mounted
vertically and supported at the
correct height so the top of the
sensor is level with the lowest
adjacent surface.
|
14
nVent.com/RAYCHEM
Step 12: Connect and install the temperature sensor if
applicable
Install the temperature
sensor in accordance with the
manufacturer's instructions.
Step 13: Complete wiring and install control and monitoring
equipment
Install panels, control units, thermostats and manual control
equipment in accordance with the manufacturers' instructions.
Step 14: Perform final system inspection and tests
a) Inspect all wiring for conformance to design drawings.
b) Verify that all protection devices have the correct rating.
c) Perform controller checks in accordance with the manufacturer's
instructions.
d) Complete required testing in accordance with applicable building
and electrical codes.
Step 15: Documentation
The installer must supply the operator/owner with the layout
drawing and a copy of the Installation and Inspection Record.
Level with the lowest