Item:
CDL4S-13WPCS-U
CDL4S-RM-12WPCS-U
CDL6S-16WPCS-U
CDL6S-RM-24WPCS-U
CDL8S-26WPCS-U
CDL8S-RM-30WPCS-U
CDL10S-36WPCS-U
COMMERCIAL DOWNLIGHT POWER & COLOR SELECT
Drywall Pan Ceiling Installation (Without Hangers):
Figure 13
Hanger Bar Installation:
Figure 14
Drywall Pan Ceiling Installation with Hanger Bars:
Figure 15
T-Grid Ceiling Installation with Hanger Bars:
Figure 16
©2023 Southwire Company, LLC. All rights reserved.*Registered Trademark &
CDL-DWP
CDL-J-BOX
CDL-HB
CDL-EMBB8
INSTALLATION INSTRUCTIONS
1. Apply the drywall pan to the ceiling joist in the desired fixture location.
Be sure to allow enough space for the J-Box mounted on the pan(If
applicable). Screw the frame to the joists using appropriate hardware
(Not Included) to secure it in place. See Figure 13.
2. Install drywall over the drywall pan. Follow the directions for Internal
Driver Installation or Remote Driver Installation.
1. Install the (4) pan head screws into the drywall pan from the bottom
(Screw heads should be on the bottom of the pan). Do not fully tighten.
Leave a 1/8" space. See Figure 14.
2. Place the keyhole of the slide over 2 pan head screws and slide in. Fully
tighten the screws and ensure the hanger bars are secured in place for
proper installation.
3. Follow the directions for Internal Driver Installation or Remote Driver
Installation.
1. Secure the assembly between the ceiling studs in the area desired for
installation. See Figure 15.
2. Install drywall over the drywall pan. Follow the directions for Internal
Driver Installation or Remote Driver Installation.
1. Center the pan on the ceiling tile and secure the assembly to the T-Grid
placing the hanger bar ends onto the T-Grid and securing them with
screws (NOT INCLUDED). See Figure 16.
2. Follow the directions for Internal Driver Installation or Remote Driver
Installation.
800-666-2852 | TOPAZ-USA.COM
Trademark of Southwire Company, LLC.