Item:
CDL4S-13WPCS-U
CDL4S-RM-12WPCS-U
CDL6S-16WPCS-U
CDL6S-RM-24WPCS-U
CDL8S-26WPCS-U
CDL8S-RM-30WPCS-U
CDL10S-36WPCS-U
COMMERCIAL DOWNLIGHT POWER & COLOR SELECT
COMMERCIAL DOWNLIGHT POWER & COLOR SELECT
INSTALLATION INSTRUCTIONS
Accessory Installation:
New Construction Drywall Pan Frame Installation:
Figure 12
J-Box Installation:
Figure 9
Figure 10
Figure 11
©2023 Southwire Company, LLC. All rights reserved.*Registered Trademark &
CDL-DWP
CDL-J-BOX
CDL-HB
CDL-EMBB8
INSTALLATION INSTRUCTIONS
1. Select the hole size by matching the fixture to the printed ring sizes on
the frame kit. Select the ring that is slightly smaller than the outer
diameter of the fixture. Using a pair of cutters, cut out the ring that
corresponds to the fixture size being installed (See Drywall Pan Frame
Dimensions for reference to fixture size). See Figure 12.
2. Mount the J-Box adapter (CDL-J-BOX Sold Separately) (if applicable).
See J-Box Installation.
3. Install the 2 hangar bars (CDL-HB Sold Separately) onto the pan (if
applicable).
1. The Junction Box accessory comes in three parts (one J-Box cage and
two J-Box side covers). Mount the J-Box cage to the Drywall Pan Frame
(CDL-DWP sold separately) by lining up the tabs on the bottom of the J-
box cage with the precut holes in the pan. Be sure to mount the J-Box
accessory to the top side of the pan - the etched cutout dimensions
can be read from the top of the pan. See Figure 9.
2.
Bend the tabs over to secure the J-Box to the drywall pan frame. See
Figure 10.
3.
Note: Leave 1 side of the J-Box open to complete the wiring. Once the
wiring is complete, install the second cover.
800-666-2852 | TOPAZ-USA.COM
Install one J-Box side cover by inserting the bottom tabs into the
precut holes. Then swing the J-box side cover closed using the clips
on the top of J-box cage. Be sure the indention faces out so the clips
grip securely to the cover. See Figure 11.
Trademark of Southwire Company, LLC.