Télécharger Imprimer la page

Bostitch CAP2040P-OF Manuel D'utilisation Et D'entretien page 8

Publicité

Les langues disponibles

Les langues disponibles

OPERATION INSTRUCTIONS
Pre-Start Procedures:
1. Inspect the compressor for any damaged components. Do not operate if compressor is
damaged.
2. Verify that the tanks have been drained and are clear of any moisture or dirt (See
"Draining Tank").
Start-Up Procedures:
1. Verify that the On/Off switch is in the Off position.
2. Verify that the tank air pressure is at 0 PSI.
3. Attach the air hose to the discharge line.
4. Plug the unit into a properly grounded outlet.
5. Pull out the On/Off switch to On. The compressor will automatically cycle on and off to
keep the tank pressure maintained .
6. Adjust the pressure regulator to the proper pressure setting required for the air tool.
Shut-Off Procedures:
1. Push in the On/Off switch to the Off position.
8

Publicité

loading