Installation (continued)
TOPMOUNT INSTALLATION
PREPARING THE AREA
NOTE:
Topmount sinks are dropped into the counter from above. If you are
installing an undermount sink, please see "undermount installation"
on page 6.
- Remove the topmount sink template (1C) from the box
- Center the template (1C) on the counter so that it is
parallel to the front of the counter (ensuring that it will not
interfere with the inside structure of the cabinet or the
counter) . It must clear the overhang of the counter and
the front inside face of the cabinet .
CUTTING THE COUNTER
CAUTION: Always wear safety goggles and gloves when
using power tools to prevent personal injury .
- Place a line of tape around the template (1C) .
- Use a saber-saw or jig-saw to cut along the cut line . Place
a support underneath the cut-out portion of the counter to
prevent it from falling during cutting .
- Insert the sink (A) into the cut-out in the counter to test
the fit. Make adjustments to the cut-out, if necessary.
Tape
1C
9
Please contact cs@conglomkb .com or 1-877-333-0098 for further assistance .
CONGLOMKB .COM