Télécharger Imprimer la page

Fellowes Array AR2 Guide D'installation page 4

Masquer les pouces Voir aussi pour Array AR2:

Publicité

Les langues disponibles

Les langues disponibles

12
Check below units for visible gaps. If needed,
add centering blocks between unit and grid. Trim
out as desired.
14A
Working from above the unit, attach a UL
approved straight or 90° elbow to connect
conduit.
15
Ensure power switch located on the power supply
is in the off position before proceeding with
connecting any wires.
4
13
Coil and wrap remaining cable out of the way.
Do not trim excess cable lengths.
14B
16
Black
Line
Green
Ground
White
Neutral
Have a qualified electrician connect the ground, line,
and neutral to fixture per local electrical codes.
Turn on power supply switch.
Now the unit is set up and can be controlled with the
buttons behind the filter door.
All wirings connected in junction box should be
connected with twist connectors.
14A
Tape off the hook slots as shown.
14C
Unit AC Input
2
3
4

Publicité

loading