How To Prepare The Machine For Operation; Machine Operation - Alto CLARKE SUMMIT Pumper Manuel D'utilisation

Table des Matières

Publicité

Figure 4
Figure 5
Page -14-

HOW TO PREPARE THE MACHINE FOR OPERATION

To prepare the machine for operation, follow this proce-
dure:
1. Remove hose from carton.
2. Remove head assembly from tank before removing
tank from carton.
3. Remove tank assembly from carton.
4. Attach head assembly to tank.
5. Attach hose to inlet adapter.

MACHINE OPERATION

When using machine for liquid pickup, follow this proce-
dure:
1. NOTE:
This machine has a float shut-off. When
the water raises the float, the air stops moving
through the machine.
2. Turn machine on and begin vacuuming. The ON/OFF
switch is on top of the vacuum head assembly. Put
the switch in the "I" position to start the motor. Put
the switch in the "O" position to stop the motor.
3. When cleanup is complete, empty the liquid by turning
the knob on the cover to "Pumper". See figure 4.
4. For best performance, clean the mesh screen around
the float often. See figure 5.
There are no user serviceable parts. All re-
pairs must be done by authorized personnel
only.
CLEANUP MAINTENANCE
Thoroughly flush and rinse tank with clean water after use
to avoid residue buildup.
CLARKE TECHNOLOGY Summit Pumper Operator's Manual

Publicité

Table des Matières
loading

Table des Matières