Télécharger Imprimer la page

Pfister Avalon 808-WS-CB0 Manuel D'installation page 3

Publicité

Les langues disponibles

Les langues disponibles

7
7A
7G
7D
7C
7E
7 TRIM FLANGE ATTACHMENT
Position Flange (7A) on Valve (7B) with Drain Hole (7C) at the bottom. Place
Protective Washer (7D) on the short end of the reversible Retainer Sleeve (7E).
Screw Retainer Sleeve (7E) onto threaded section of the Stem and Bonnet (7G).
Tighten Retainer Sleeve (7E) by hand until Flange (7A) is snug to finished wall
surface. If the short end of the Retainer Sleeve (7E) is too short, reverse it to
use the longer end.
8
8A
8D
8C
8E
8 HANDLE ATTACHMENT
Screw Stem Extender (8A) onto the Valve Stem (8B). Thread the Set Screw (8C)
into the Handle (8D) and thread it in only three to four turns. Place Handle (8D)
onto the Stem Extender (8A) and tighten the Set Screw (8C) by using the Hex
Wrench (8E) that is provided.
Make sure Set Screw (8C) is securely tightened to handle (8D).
7B
7C
8B
ENGLISH
9
9B
9 SHOWER ARM INSTALLATION
Insert the end of Shower Arm (9A) through the Shower Flange (9B). Apply PTFE
plumber's tape to both ends of Shower Arm (9A) according to manufacturer's
instructions. Screw the end of Shower Arm (9A) into pipe elbow inside the wall.
Slide Shower Flange (9B) tight to the wall.
10
10B
10C
10 SPOUT INSTALLATION
Apply PTFE plumbers tape on both ends of Pipe Niple (10A) (not included).
Screw Pipe Niple (10A) into the elbow inside the wall and tighten with pipe
wrench. The Pipe Niple (10A) is to project 3
Screw Tub Spout (10B) onto Pipe Niple (10A) and tighten until Spout is properly
positioned and flush to the finished wall.
11
11 UNIT START UP
Turn on hot and cold water supplies, and check all connections for leaks.
3
9A
10A
7
3
7
/
" to 4" from the finished wall.
8
/ 8 " to 4 "

Publicité

loading