2.1 Installation
Before the installation take away the equipment from its packing. Some pieces are protected with a plastic film that must
be taken away with care. If some residuals of glue remains on the surfaces take care to remove it acting with right
substances, like gasoline, and never with abrasive substances.
Fit up the feet on the equipment. The equipment must be levelled (the feets are adjustable for height). Make sure of the
becking plate solidy.
The master switch or the socket must be near the equipment and within easy reach. The installation of an exauste hood
over the equipment is advisable. Take care to observe all fire-fighting law prescriptions.
2.2 Law prescriptions regulations - instructions
The installation must be executed complying the following rules:
-
Accident preventions rules in force.
-
Prescription VDE in force.
2.3 Installation
Installation, start-up and maintenance of the appliance must be performed by qualified staff. All work required for
installation must be performed in accordance with the laws in force. The manufacturer declines all responsibility in the
event of malfunctioning due to incorrect or non-conforming installation.
CAUTION! As per international regulations, during connection of the appliance a device is to be provided upstream of the
same in order to disconnect the appliance, on an omnipolar basis, from the mains. This device must have an opening of
the contacts of at least 3 mm.
2.4 Electrical connection
The connection cable chosen must have the following features: it must be at least H05 RN F and with an adequate
section for the appliance.
EQUIPOTENTIAL
The appliance is to be connected in an equipotential system.
CAUTION! The manufacturer is not responsible, and does not compensate under guarantee, damage caused by
inadequate installations not conforming to the instructions.
2.5 Start-up
Before using the appliance for the first time we recommend cleaning the top thoroughly (see paragraph "Cleaning and
care") in that it is protected by mineral oil. Check on the connection of the appliance and start it up according to the
instructions, leaving it to function loadless for around 15 minutes.
2. INSTALLATION
- 9 -