Télécharger Imprimer la page

Zephyr Essentials Verona ZVN-M90AG Guide D'utilisation, D'entretien Et D'installation page 11

Masquer les pouces Voir aussi pour Essentials Verona ZVN-M90AG:

Publicité

Les langues disponibles

Les langues disponibles

!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
Ceiling Joists
Wood Blocking
Top Support Frame
Bottom Support Frame
Hood Body/Canopy
Hood is intended to be mounted to a fi nished ceiling.
1. Ceiling Preparation: Determine hood mounting location and temporarily tape paper template (incluided with the
hood) to the ceiling. Cut-out internal shaded area of template to allow the ductng and electrical to pass through.
Add wood blocking (min. 2" x 4") onto ceiling joists to refi nforce ceiling above the drywall. (FIG. A, #1) Secure (2)
1-
" wood screws into points A and B of the paper template (FIG. B). Do not completely tighten screws, leave
1/2
approx. 1/4" exposed.
2. Hood Preparation: Remove screws securing top and bottom support frames together. Adjust support frame to
accomodate the desired hood height and re-assemble the frame using the previously removed screws (2 screws
for each support frame arm). (FIG. A, #2).
1
3
2
4
FIG. A
PAPER TEMPLATE
A
9
Front of Hood
C L
Cut-Out Shaded Area
B
FIG. B

Publicité

loading

Ce manuel est également adapté pour:

Essentials verona zvn-e42ag