Télécharger Imprimer la page

Napoleon Element NEFB36H-BS-1 Manuel D'installation Et D'utilisation page 16

Publicité

Les langues disponibles

Les langues disponibles

installation and finishing
EN
C
4.
Install log C, resting it along the top left end of
log A (see below for details).
C
5.
Install log D, resting it along the centre of the
front grate (see next page for details).
16
W415-3155 / B / 07.06.23
B
A
C
Straddle the two legs of log C onto the #1
Hang log C onto the pin at log A through the
LOG C: DETAILED INSTALLATION VIEW
A
B
D
Grate
frame of the grate.
position hole.
C
6.
Install log E, resting it on the top right end of log
B (see next page for details).
A
E
B
D

Publicité

loading

Ce manuel est également adapté pour:

Element nefb42h-bs-1