Télécharger Imprimer la page

Bromic Heating Tungsten 300 smart-heat Manuel D'installation page 24

Publicité

Les langues disponibles

Les langues disponibles

pOST-INSTALLATION REpORT
pOST-INSTALLATION REpORT
FOR TUNGSTEN SMART-HEAT GAS RADIANT HEATERS
aFTer heaTer InsTaLLaTIOn PLease PhOTOCOPY, COmPLeTe, & senD ThIs rePOrT BY:
FaX TO (02) 9748 4289 or BY maIL TO Bromic heating Pty Ltd, 1 suttor street, silverwater nsW 2128 australia
Customer Business name:
dd
mm
/
/
Date:
site address:
suburb:
state:
Customer Contact Details:
Name:
Position:
Ph: (
)
mobile:
Installer Contact Details:
Name:
Position:
Ph: (
)
mobile:
signature of authorised person:
name:
Company:
dd
mm
Date:
/
/
24
or sCan anD emaIL TO info@bromicheating.com
yyyy
Postcode:
Fax: (
)
Fax: (
)
yyyy
www.bromicheating.com
please fill in the relevant information or circle the
appropriate Yes/No responses below:
How many Tungsten Smart-Heat
heaters are installed on this site?
What type of gas is used?
Is/Are the heater(s) exposed to
salt air or any other corrosive or
chemical atmosphere?
Does the heater(s') installation
location pose a hazard to the site?
Do heater clearances match the
minimum requirements outlined
in the "Installation Requirements"
section of the Installation,
Operation and Service Manual?
Is the gas supply line adequately
sized for the number of heaters
installed?
Have gas lines been purged of air?
Have gas lines been checked for
leaks with a soapy water solution?
Was the heater field tested and
operated without malfunction?
What is the inlet gas supply
pressure?
What is the gas valve outlet
pressure (at test point)?
Position:
3-Tile:
5-Tile:
________
________
Natural
LPG
Gas
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
_________ kPa
_________ kPa

Publicité

loading

Ce manuel est également adapté pour:

Tungsten 500 smart-heat