Télécharger Imprimer la page

Bromic Heating Tungsten 300 smart-heat Manuel D'installation page 13

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTIONS
3
Heat-deFlector InstallatIon
1. Remove Heat Deflector and brackets from packaging
2. Mount Heat Deflector brackets to top side of heater
using 2 M4 screws provided
3. Attach inner skin of heat deflector to mounting brackets
using 4 M4 screws provided
4. Attach Outer skin to Inner skin using 4 M4 bolts
provided.
ceIlInG Pole InstallatIon
1. Mount Top Bracket to ceiling or support beam using
suitable fixings no less than 60mm length.
!
WARNING
When mounting ceiling pole, ensure the anchoring to the
structure is of sufficient strength, quality and workmanship
to support the weight of the heater and any other load that
could be applied to the fixture.
2. Assemble pole to the mounting bracket using the
M8x100mm and M19x100mm bolts, and fix using nuts
and washers (as supplied).
3. Assemble both lower paddles to the pole (back to back)
and insert 3 M10x100mm bolts and fix using nuts and
washers (as supplied).
CONTINUED...
4. Fix Heater to Lower paddles using suitable fixtures.
NOTE: Tungsten Heating recommends running power and
gas lines, to the heater, inside the pole to reduce visibility
and likelihood of damage.
3
www.bromicheating.com
1
2
4
13

Publicité

loading

Ce manuel est également adapté pour:

Tungsten 500 smart-heat