Télécharger Imprimer la page

probst UMG-60/150 Instructions D'emploi page 37

Publicité

Les langues disponibles

Les langues disponibles

Operation
6
Operation
6.1
Device operation
Connect the UMG with the suspension lug to the lifting equipment.
Lower the UMG into the stack of steel pallets until the opening width adjustment is laying on the stack or
the gripping arms have contact to the floor.
If the UMG is completely set down, the automatic release unlocks.
Lifting up, the UMG opens and the gripping arms come in contact with the stack.
Now you can move the UMG and the goods to the position you want.
Setting down the UMG the automatic release will lock and you can lift the UMG without the goods.
Placed over the next product, the automatic release disengages itself and the product can be lifted.
The device therefore is a ONE-MAN-MACHINE.
6.2
Picture of the automatic release
The device is equipped with an automatic release, that means the OPENING and CLOSING of the gripping arms results
through the set down and lifting of the device.
Pictures of the positions of the automatic release:
Device is lifted through the
lifting equipment/carrier
Gripping arms are opened
With faulty switching, the
change-over switch must be
pushed back manually (e.g.
with a screwdriver)
57200050
Device is set up on the gripping
good
Gripping arms are opened
Device is set down with the gripping good (on
the ground)
Gripping arms are opening
1)
Device is lifted through the lifting
equipment/carrier
Gripping good is clamped and can be
transported to the destination
13 / 18
Device is lifted through the
lifting equipment/carrier
Gripping arms are opened
(laydown position of the
device on the ground)
GB

Publicité

loading