2.
Connect neutral wire
C
Connect neutral wire (white or center) (C) of power supply cord
to center terminal block screw (B). Tighten screw.
3.
Connect remaining wires
Connect remaining wires to outer terminal block screws. Tighten
screws. Finally, reinstall terminal block cover. Secure cover with
hold down screw. Now, go to "Venting Requirements."
DIRECT WIRE CONNECTION
B
B
Direct Wire Strain Relief
1.
Attach direct wire strain relief
Unscrew the removable conduit connector (A) and any screws
from a 3/4" (19 mm) UL Listed strain relief. Put the threaded
section of the strain relief (C) through the hole below the
terminal block opening (B). Reaching inside the terminal block
opening, screw the removable conduit connector (A) onto the
strain relief threads.
A
B
C
13