Télécharger Imprimer la page

peerless-AV SAX762PU Installation Et Assemblage page 12

Publicité

Les langues disponibles

Les langues disponibles

Cable Management
NOTE: Make sure cables have enough slack to allow full movement of the arm.
9
Run power cable through top or bottom of wall arm (A) and signal cable(s) through other side of arm in order to
avoid interference with the signal. Secure cables into place with two sets of cable covers (K, L) on each arm.
Display may have to be moved for easy access.
Snap wall plate covers (F) to top and bottom of wall
10
plate rails as shown.
L
CABLES
K
WALL PLATE RAIL
F
12 of 41
ISSUED: 01-25-12 SHEET #: 095-9370-6 09-20-13
L
L

Publicité

loading

Ce manuel est également adapté pour:

Sax772pu