WHB5222 BASIN INSTALLATION
INSTRUCTIONS
For new constructions, we recommend that the exact
sink location be determined prior to finishing the wall.
Support the wall hanger and mounting screw loca-
tions with 2x6 frame or appropriate sink carrier. On
an existing wall, you may need to open the wall to
accomplish this.
(Note: these steps are not required for poured con-
crete or block walls).
* 34" (863mm) Recommended
* For ADA - 34" (863mm)
* For CSA B651 - 33" (840mm)
* For BCBC - 34 1/4" (865 mm)
For wheelchair accessible installations, maintain 8" (203mm)
clearance to the left and right sides of the basin.
TOOLS REQUIRED
• Pencil
• Tape Measure
• Carpenters Level
• Power Drill and Bits
• Wrenches and Screw Drivers
• Suitable Wall Mounting Hardware
DIRECTIVES D'INSTALLATION
DE L'ÉVIER WHB5222
Dans le cas d'une construction neuve, nous recom-
mandons que l'emplacement exact de l'évier soit dé-
terminé avant la finition du mur. Retenir le support de
suspension mural et les vis de fixation à l'aide d'un
cadre de montage de 2x6 ou d'un support d'évier
approprié. Dans le cas d'un mur existant, il peut être
nécessaire de l'ouvrir avant cette opération.
(Note : ces étapes ne sont pas nécessaires lorsque le
mur est en béton coulé ou en blocs).
* Hauteur de montage recommandée est de 34 po (863mm)
* Accessible en fauteuil roulant - 34 po (863mm)
* Pour se conformer à la norme CSA B651 - 33 po (840mm)
* Pour se conformer à la norme BCBC - 34 1/4 po (865mm)
Pour fauteuil roulant installations accessibles, maintenir 8 po
(203mm) de dégagement sur les côtés gauche et droit du bassin.
OUTILS NÉCESSAIRES
• Crayon
• Ruban à mesurer
• Niveau à bulle
• Perceuse électrique et forets
• Clés et tournevis
• Quincaillerie de fixation murale
10/19
|
2030011197_WHB5222