MOUNTING INSTALLATION INSTRUCTION
2. WIRING - Modular Installation
a.
Connecting the 480V Power Source – CAM (-3 Model) or other Receptacles
i.
If you have ordered your Modular Welding Station with input and
output devices, no additional wiring is needed.
ii.
Connect the Input Power and Feed-Thru receptacles as needed.
The unit is rated for 100 Amps 480V 3P4W only.
b. Connecting the 480V Power Source – Direct Wire (-2 Model)
i.
Ensure all power is off and all inverters are disconnected
ii.
Open the 120V Secondary Panel Door (Figure 3)
iii. Remove the dead front panel with 4 screws (Figure 4)
iv. Create cut outs per the drawing location (see drawing and table) for
both 480V input and 480V feed-thru power. (Figure 5)
1
2
4
3
6
5
Figure-3
Figure-4
5
Figure-5
v.
Remove all metal shavings
vi.
Attach strain reliefs as necessary per the recommended cable OD.
Caution: Strain reliefs must be UL Listed for Outdoor Use.
vii. Feed both input and feed-thru cables through enclosure and
strain reliefs
viii. Terminate cable per the below table to the Incoming lugs of the
Terminal Block, setting torque to below
Figure-7
ix. Tighten all strain relief connections
x. Using a multi-meter, ensure connection between the power source
and feed-thru to ensure a good connection
xi. Dress wire appropriately using zip ties to keep wires clear of operator
areas and metal edges
xii. Replace the dead-front panel
6