Do Not Install In A Mobile Home
READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION.
Position unit to comply with the minimum clearances to combustible materials. Minimum clear-
ances are shown in fi gures 1 and 2. It is recommended that no overhead cross members in the
ceiling or roof be cut. Reposition unit if necessary, being careful not to move closer than the
minimum clearances.
VENTING REQUIREMENTS
Use a masonry, "B" vent or
class "A" chimney. Follow all
manufacturers' requirements
and local building codes. If
you are using "B" vent utilize
the support box supplied
with unit.
GAS LINE ATTACHMENT
1. The gas supply line must be installed to pene-
trate the fl oor, (or fl oor protector if required), at the
center-line of the gas unit. This supply line must
be a minimum of 1/2", black iron type pipe.
2. The gas supply line with a 90 degree elbow
should be 10 1/2" minimum to 11" maximum from
the fl oor or fl oor protector to the top of the elbow.
The elbow must face the front of the unit.
3. Place the unit base assembly over the top of the
gas line. Confi rm that wall clearances are correct
prior to proceeding.
4. Lift the control cover. Using a 1/2" x 8" nipple,
extend the gas supply line to the front of the
unit.
5. Attach gas supply shut-off valve part # GF-1A to
the supply line.
6. Connect 3/8" x 12" fl ex connector part # GF-1B
to the shut-off valve.
7. Make certain the gas valve is closed. Turn on
gas supply and test for leaks using a soapy
water solution.
All manuals and user guides at all-guides.com
Installation Instructions
8" "B"-Vent
Locking Tab
Starter Band
Support Box
GF2/GF3 Page - 5
1/2" Black Elbow
1/2" Black Pipe
Floor or Floor
Protector
8" "B"-Vent
Framing
Sheet Rock
Support Box
9" Slip Connector
9" Middle Pipe
Section
10 1/2" to 11"
From Top Of
Elbow To Floor or
Floor Protector
GF2/3 5/1/15