All manuals and user guides at all-guides.com
2 INSTALLATION INSTRUCTIONS
GENERAL
Open the box carefully and remove all packaging.
The following material is included:
1. CLS-E NG Yoke
2. USB Cable
3. Power supply with cable
4. This manual
MOUNTING & OPERATING CONDITION
1. The unit must be mounted with 4 Screws or 2 clamps securely
on a fl at surface before operating.
2. Keep a minimum of 5 cm distance around the unit from any part.
3. Keep environmental temperature below 40°C max.
4. Use only in dry environment.
FIRST START / ELECTRICAL CONNECTION
1. Connect the provided power supply to Power Plug.
2. Connect the CLS-E NG Yoke with your computer
via the provided USB cable.
3. Connect the delivered AC main power plug to the Power Supply
and connect the power cable to the AC-power outlet.
The calibration and initialization sequence will start automatically.
Axis are moving across their range.
DO NOT DISTURB THIS SEQUENCE UNTIL THE YOKE IS CENTERED!
THIS SEQUENCE IS REPEATED EVERY TIME WHEN POWER IS
APPLIED.
4