EN
SETTING UP THE TENT
1.
Open the f rame in a suff iciently large area with the zips uppermost.
2. Attach the pressure gauge to the valve provided on one of the legs.
3.
Check that all the other valves and the transverse zips on the legs are closed.
4. Lay the roof fully open on the f rame and zip it in place. To do so, use the inner zip on the
roof canvas. The two outermost zips on the roof are used to attach the side walls later.
Close the zips fully to the end.
1.
3.
AIRSPACE - MANUAL
11
2.
4.