No.
1
Production supply
2
Production return
3
Brine supply
Model
ecoGEO HPx 12-40 kW
ecoGEO HPx 15-70 kW
ecoGEO HPx 25-100 kW
2.3. Unpacking
To unpack the heat pump, remove the wooden box carefully, remove the pallet anchoring screws and perform a check to make
sure the heat pump has not been damaged during transportation.
Before starting up the heat pump, remember to remove the anchors from the mobile base of the
compressor; these could impair proper unit operation.
NOTE
Anchoring studs
All manuals and user guides at all-guides.com
Description
Table 1.1. Connections key.
Connection
(1) Production supply
(2) Production return
(3) Brine supply
(4) Brine inlet
(1) Production supply
(2) Production return
(3) Brine supply
(4) Brine inlet
(1) Production supply
(2) Production return
(3) Brine supply
(4) Brine inlet
Table 1.2. Dimensions of the hydraulic connections.
Figure 1.2. Disassembly of the transport fastening systems.
Installer manual ecoGEO HP
No.
4
Brine inlet
5
Power cables inlet
6
Control cables inlet
G2-1/2" Male
Compressor anchoring
30
Description
Dimension
G2" Male
G2" Male