Télécharger Imprimer la page

Hoover DYNAMIC DRY 9+ DYH 9913NA1X Mode D'emploi page 12

Masquer les pouces Voir aussi pour DYNAMIC DRY 9+ DYH 9913NA1X:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 86
Delay Start Function
The Delay Start Function
When the function is first selected the display will show a delay of 1 hour, subsequent presses of
the button will increase the delay with 1 hour steps.
To commence the programme press
end of this time. The indicator light will flash to indicate that the start delay is in progress.
Cancelling and Resetting the Programme
To cancel a programme press the
Light will flash to indicate that it has been reset.
CLEANING AND ROUTINE MAINTENANCE
Cleaning the Dryer
Clean the filter and empty the water
container after every drying cycle.
Regularly clean the filters.
After each period of use, wipe the inside of
the drum and leave the door open for a while to
allow circulation of air to dry it.
Wipe the outside of the machine and the
door with a soft cloth.
DO NOT use abrasive pads or cleaning
agents.
To prevent the door sticking or the build up
of fluff clean the inner door and gasket with a
damp cloth after every drying cycle.
WARNING! The Drum, door and load may
be very hot.
EN 12
All manuals and user guides at all-guides.com
allows the user to delay the start of the drying cycle by 1 to 24 hours.
and the appliance will complete the drying cycle at the
button for 3 seconds. In the TIME CONTROL display 0:00
EN 61121 Programme
-DRY COTTON
-IRON DRY COTTON
-EASY-CARE TEXTILE
the plug from the electricity supply before
cleaning this appliance.
the front of the dryer cabinet (with the door
open).
OPERATION
Technical Specifications
Drum capacity
Maximum load
Height
Width
Depth
Energy Label Band
Information for Test Laboratory
IMPORTANT Always switch off and remove
For electrical data refer to the rating label on
115 litres
9 kg
85 cm
60 cm
60 cm
A +
Programme To Use
-HANG DRY
-IRON DRY
-HANG DRY + SYNTHETIC

Publicité

loading