In-duct fire damper BAE
PREPARATION FOR INSTALLATION
Fig. 1 Installation of end switch BA-S (accessories)
Pos. 1
Insert the holder in the Tslot in the inner ring of the shutter element
Pos. 2
Push the holder down to the stop in the Tslot
Pos. 3/4 Clip BAS end switch to the holder. Then test the function of the push button.
Pos. 1
Holder
Fig. 2 Replace fusible link
Pos. 1
Press to the side of the fused link against the insert lever and remove
Pos. 2
Place the replacement fusible link (Accessories, Ref. no. 84974) in the fusible link holder and lock in place
Pos. 1
Fig. 2 Attach fusible link
Pos. 3
In order to attach fusible link, bend the catch springs in the inner ring of the shutter element outwards
Pos. 4
Push the two semicircular damper blades together so that the fusible link can be attached to the locking catch.
ACCESSORIES
End switch BA-S (kit)
with holder
Ref. no. 02585
End switch for BAE monitoring
and signalling of operating status
to the central building manage
ment system. Attachable to all
standard diameters.
Replacement fusible link for BAE
Pos. 2
Pos. 2
Fusible link
Ref. no. 84974
Pos. 3
Pos. 3
Catch spring
Mounting sleeve EH (accessories)
Ref. no. see table
Mounting Ref.
Dimensions in mm
sleeve
no.
ø C ø D
EH 100
2639
101
EH 125
2640
128 123
EH 160
2641
162 158
EH 200
2642
201 197
2
Pos. 4
Pos. 4
ø E
ø F
98
92
120
92
120
114 140
120 150
Dimensions in mm
see table
Fig.1
Fig.2