Télécharger Imprimer la page

V-TAC VT-6603105 Manuel D'instructions page 14

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION OF SINGLE-PHASE INVERTER
Figure 10 Installation bracket
of 0.75~3KW inverter
Table of size of installation bracket
M o de l
0.75KW / 1 KW / 1 .5KW / 2KW / 3KW
4KW / 4.6KW/ 5KW/ 5.5KW / 3KW-2M /
4KW-2M / 4.6KW-2M / 5KW-2M / 5.5KW-
2M / 6KW-2M
INSTALLATION STEPS:
(1) Firstly, take down the installation bracket from the package.
(2) Place the bracket at the appropriate height and position on the wall. Mark the punching
position according to the fixing hole. Drill holes of 70mm deep and install the expansion
screw. Fix the bracket on the expansion bolt according to the arrow instruction. Ensure the
installation is firm enough, the tightening torque is 8Nm.
(3) Lift the inverter to suspend it on the installation bracket through M8 hex socket cap
screws.
(4) Finally, fasten the inverter and the bracket with M5 screws and tighten the screws to 2
Nm. For firm installation, the operators cannot release the device until the inverter is
installed on the bracket firmly.
Ins t a lla t io n ho le
A (mm)*B (mm)
1 95
260*45
Figure 12 Installation of inverter
Figure 11 Installation bracket
of 4~6KW inverter
Table of instruction of installation bracket
N o .
S t ruc t ure ins t ruc t io n
1
Installatio n ho leΦ 8
2
A ssembling bo lt ho le M 5
14

Publicité

loading

Ce manuel est également adapté pour:

Vt-6605105Vt-6603110Vt-6605110