1
MAKE ALL CONCEALED PIPING CONNECTIONS
n
See Roughing-in diagram before starting.
n
Make Hot and Cold supply connections to the VALVE BODY. Inlet and outlet connections to the valve body are 1/2" copper
sweat.
n
Make Tub Filler connection from DIVERTER. (Use the port with the BATH TUB picture). DIVERTER IS 1/2" NPT. TUB
SPOUT
connection is 1/2" copper for SLIP-ON SPOUT.
n
Make the connections for the HAND SHOWER. The HAND SHOWER connections are 1/2" NPT.
n
For support, use PIPE BRACES secured to wooden braces. Cap off HAND SHOWER and TUB SPOUT FILLER PIPE.
With the FLASH VALVE turned off, turn on water supplies. Check for leaks.
n
Finish all wall construction.
2
INSTALL VALVE TRIM AND TUB SPOUT
NOTE: REFER TO INSTALLATION INSTRUCTIONS (M965937)
SUPPLIED WITH VALVE TRIM KIT FOR COMPLETE
INSTALLATION AND REPAIR PART INFORMATION.
n
When finished tiling the wall, remove PLASTER GUARD.
n
Remove plug from shower pipe.
PLASTER GUARD
1-1/2" REF.
PLUG
FLOWISE
SHOWER
HEAD
O f f
- 2 -
H
FLOWISE
SHOWER
HEAD
C
PLASTER GUARD
M985054 Rev. 1.0 (4/21)
PLUG
C
O f f