Installation
10) Install slide assembly (P) to slide
bar (N). Flat edge on (P2) and
(P3) must be aligned. Arrows
on (P2) and (P4) indicate bottom
side.
P1
P2
SLIDE
P4
LOCK
SLIDE
Note: Adjust screw cap (P1) for ease
of movement of slide assembly.
Operation (Temperature Control)
1) Turn shower handle counterclock-
wise approximately 1/4 turn to put
valve in cold position.
Operation (Diverter Control)
1) Cartridge is factory set to divert
to function 1.
11) Press tabs on wall ell flange and
install wall ell (O) to pipe fitting.
Turn clockwise to secure.
N
O
P3
2) Turn shower handle counterclock-
wise approximately 1/2 turn to put
valve in warm position.
2) Turn handle to position 2 to share
functions 1 and 3.
12) Attach hand shower (L) to hose (R).
1
1
3) Turn shower handle counterclock-
3) Turn handle to position 3 to divert
5
Attach hose (R) to vacuum breaker
(Q). Connect vacuum breaker (Q)
to wall ell (O). Turn clockwise to
tighten.
L
Q
R
R
wise approximately 3/4 turn to put
valve in hot position.
to function 3.
O