USE AND & MAINTENANCE
14 DECOMMISSIONING AND DISPOSAL
Decommissioning and disposal of the boiler are the exclusive responsibility
of the owner, who must act in accordance with the laws in force in the
country where the boiler is installed with regards to safety and environmental
protection.
The boiler may also be dismantled and disposed of by companies authorised
to recover and dispose of the materials in question.
INSTRUCTION: always observe the standards in force in the country where
the boiler is decommissioned as regards disposal of the materials and the
waste disposal report where required.
IMPORTANT: All dismantling operations for decommissioning the boiler
must be performed when the boiler is off and disconnected from the power
supply.
- remove all electrical equipment;
- have the structure of the boiler scrapped by an authorised company;
IMPORTANT: Dumping the boiler in accessible areas represents a serious
hazard to people and animals.
Liability for any harm caused to people or animals always lies with the
owner.
When decommissioning the boiler the ce mark, this manual and other
documents relating to this boiler must be destroyed.