Beer and Gas Lines Installation
Gas Line to Regulator Installation
1.
Attach one end of the gas line (blue) hose to the connection on the CO2
regulator.
2.
Secure the line by tightening the steel hose clamp already attached to the
line. Use Pliers/screwdriver to tighten clamp and be sure to check for leaks
in this area once the CO2 is flowing out of the cylinder.
3.
Remove one of the two plugs on the back of the cabinet by twisting and
pulling it out. (Note: Save it if you decide to place your CO2 cylinder inside
the cabinet.)
4.
Feed the other end of the gas line through the opening and attach it to the
coupler (see next steps).
Gas Line to Coupler Installation
1.
Attach the other end of the gas line (blue) to the gas input on the keg
coupler.
2.
Secure the line by tightening the steel hose clamp already attached to the
line. Use Pliers/screwdriver to tighten clamp and be sure to check for leaks
in this area once the CO2 is flowing out of the cylinder.
Beer Line Installation
1.
Place a valve washer between the beer line output on the coupler and the
nut on the end of the beer line.
2.
Tighten the nut at the beer line to the beer input on the keg coupler.
3.
Secure the line by tightening the steel hose clamp. Use pliers/screwdriver
to tighten clamp and be sure to check for leaks in this area once the CO2 is
flowing out of the cylinder.
www.newair.com
EN
12